Apologies for the formating but the following is the quote for the roof works from Bolton roofing;
bolton
2 Albert Road
Edinburgh, EH6 7DP
Tel / Fax:0131 555 4055
Email: enquiries@boltonroofing.co.uk
www.boltonroofing.com
Managing Director: R. Bolton
VAT REG NO.783511326
Ref: HB/LM
Mrs Saffrey
46 Brunswick Street
Edinburgh
EH7 5HY
28th June 2011
QUOTATION
Dear Mrs Saffrey
Re: Repairs at 46‐46a‐48‐48a‐50‐52 Brunswick Street & 47‐47a Montgomery Street.
To attend site to carry out the works detailed below:
Front right Hand Mutual Chimney Stalk to Brunswick Street (10 Vent):
To erect scaffold access tower including walkway & scaffold around the chimney with ladder
access & boarded where required.
All to comply with current Health & Safety Regulations.
Render Works:
To cut off entire rendering, bag & remove debris from site.
To soak chimney, apply 1st coat cement, lime, sand mortar scored to form key.
To apply 2nd coat mortar floated smooth & lined to resemble stone work.
Lead Works:
To supply & fit new code 6 lead water gate to one side only of the chimney stalk.
To cut chase , then supply new code 5 lead cover flashing to water gate.
To re‐point chase using polysulphide mastic.
Slating Works:
To strip down slating at the chimney stalk abutment, lay slates aside to re‐use.
Upon completion of new Watergate installation, to re‐slate using slates previously laid aside.
Total cost to carry out the above works:
£5514.00 + vat
Front Left Hand Mutual Chimney Stalk to Montgomery Street.
To erect scaffold access tower including walkway & scaffold around the chimney with ladder
access & boarded where required.
All to comply with current Health & Safety Regulations.
Render Works:
To cut off entire rendering, bag & remove debris from site.
To soak chimney, apply 1st coat cement, lime, sand mortar scored to form key.
To apply 2nd coat mortar floated smooth & lined to resemble stone work.
Lead Works:
To supply & fit new code 6 lead water gate to one side only of the chimney stalk.
To cut chase , then supply new code 5 lead cover flashing to water gate.
To re‐point chase using polysulphide mastic.
Slating Works:
To strip down slating at the chimney stalk abutment, lay slates aside to re‐use.
Upon completion of new Watergate installation, to re‐slate using slates previously laid aside.
Total cost to carry out the above works:
£5725.00 + vat
Rear Left Hand (‘L’ Shaped) Mutual Chimney Stalk to Brunswick Street:
To erect scaffold access tower including walkway & scaffold around the chimney with ladder access
& boarded where required.
All to comply with current Health & Safety Regulations.
Render & Cope Stone Works:
To seal off all fire places applicable to the vents to prevent soot & rubble damage.
To take off chimney cans, lay aside whole cans to re‐use.
Demolish & remove chimney copes.
To reform same in granolithic cast insitu with whole cans & new cans if required set within.
To cut off entire rendering, bag all debris & remove from site.
To soak chimney, apply 1st coat cement, lime, sand mortar scored to form key.
To apply 2nd coat mortar floated smooth & lined to resemble stone work.
Lead Works:
To supply & fit new code 6 lead water gate to one side only of the chimney stalk.
To cut chase , then supply new code 5 lead cover flashing to water gate.
To re‐point chase using polysulphide mastic.
Slating Works:
To strip down slating at the chimney stalk abutment, lay slates aside to re‐use.
Upon completion of new Watergate installation, to re‐slate using slates previously laid aside.
Total cost to carry out the above works:
£7076.00 + vat
If we can be of any further assistance, please do not hesitate to contact us.
Assuring you of our utmost attention at all times.
Regards
H Bolton
for Bolton Roofing Contractors Ltd